BACKGROUND
In 1968, this Department developed a Transportation
Master Plan which indicated that there were pressing
highway needs totaling nearly $3 billion beyond
those projects which were being financed as part
of the National System of Interstate and Defense
Highways. Based on current construction costs,
the first priority highway needs alone totaled
more than $1.5 billion. It was estimated that
not more than one-third of this amount could be
financed from anticipated Federal and State
appropriations during the next 10 years. For
this reason, the Department recommended that
$1 billion in bond funds be provided to construct
at least the most pressing of the State's high-
way needs.
The Transportation Bond Issue approved last Novem-
ber provided $440 million in highway funds to
apply to this range of highway projects. While
this amount obviously is not sufficient to permit
the construction of all first priority projects,
it will permit the Department to move its full
range of highway projects forward at the fastest
possible rate for approximately the next 5 years.
The results of the Transportation Bond Issue can
already to seen in that the Department has pro-
grammed for 1969 the largest construction effort
in its history. If adequate financing for Inter-
state programs is provided from Federal sources,
the Department should be able to place under
contract more than $200 million in construction
projects. By way of comparison, the previous
record amount was less than $125 million.
This fact book will help explain the relative
position of the numerous projects now actively
being pursued by this Department. It should also
give some indication of the magnitude of the task
ahead as well as the progress that is being made
on this program.
TABLE OF CONTENTS
Rinancing the Masteririllanicssssscersreassessescsrresss etre 1 Intrastate [Freeways Map) ©, <.-cscccccccecccecesecasecteaue-e 20
Department Budget — 1969) oocctrsicscessssceceeseteeses> 2 Intrastate Freeways Status Chart... 21
19695 Construction: Program so. eea seer 3 Intrastate Freeways Status
Status of Federal Freeze: 0 ..ncc.sccsscsecceesessecesssecs 4 PROUT Use eee eee cco ee eae ee ee ee 22
Local Government Aid Budget — 1969... 5 Route 18 Middlesex County ............ccccneee 23
Local Government Aid Budget — 1970 oo... 5a Route 18 Monmouth County ....cccccceceeeeeeees 24
Department Operating Budget — 1969 2... 6 Route 20 e-mrat ercrcssesicts theres nore neces oe 25
Department Operating Budget — 1970 20.000... 6a
Interstate System Map
Interstate Routes Status
Route 76
Route 78 Routers Oi... -: See es ee oe ek ee 30
Route 80 Row feria ese. ch ee ae ee ee ee 31
Route 95 Rouitez 3S ahaha srk: er eee, ee te 32
Route 195
Route 278 ....
Route 280
Route 237. Router 7 Sitinenveenceeteies at chee eee 36
Route 295 Route: 90 E eree en eee ee ee 37
Route 495 Routel 92 ocean eee 38
Routes67 Omer erence test tae ata eee Route 174
Route 09 5 peste etre Or enon eee: 19 Route 178
Router 202) 2.2 vara vet nacn eee en eee 41
Route 440 Hudson County .i..ceccecececeeeeeeeess 42
Route 440 Middlesex oo... ccecscccesecesecececeseeaee 43
Freeways Under Study oo ...c.ccccccececeseceeee 44-45
1969 Construction Projects
(non- freeways) ..........ccesceceeeserese-e-e-e-e 46-50
EXPLANATORY NOTES
"PROJECTS BEING DESIGNED FOR CONSTRUCTION" listed
at the top of each Interstate Route and Intra-state
Freeway charts are those construction projects which
were in the Design stage as of January, 1969. The
projects are listed above the appropriate segment of
the bar graph. (The list of projects being designed
for construction changes almost daily as new ones
advance from the planning stage, and others move to
construction. )
Estimated costs to complete Interstate Routes and
Intra-state Freeways listed on the charts depend
upon availability of Federal funds.
Costs to complete Interstate Routes and Intra-state
Freeways listed on the charts include the cost of
upgrading and expanding certain sections now open to
traffic as a result of design changes and safety
improvements mandated by Congress.
1 AAS 3
THE DEPARTMENT PROPOSED ...
$3.275 BILLION
FIRST PRIORITY TEN YEAR PLAN SECOND PRIORITY TEN YEAR PLAN |
$2,075 BILLION
$1.2 BILLION
$2.075 BILLION
STATE HIGHWAYS $1.4 BILLION
STATE AID $300 MILLION PUBLIC TRANS. $375 MILLION
STATE — $275. MILLION
FEDERAL — $175. MILLION
BONDS — ONE BILLION
STATE — $150 MILLION STATE — $50 MILLION
FEDERAL $125 MILLION
BONDS — $200 MILLION
GAS TAX — $150 MILLION
CAPITAL NEEDS COMMISSION RECOMMENDED....
*
TEN YEAR PLAN $1.925 BILLION
STATE HIGHWAYS $1.250 BILLION STATE AID $300 MILLION PUBLIC TRANS. $375 MILLION
FIRST FIVE YEARS -$1.225 BILLION
STATE HIGHWAYS $725. MILLION STATE Al
TATE HIGHWAYS $725_ MILLION $150 Million PUBLIC TRANS. $350 MILLION
STATE — $112.5 MILLION
FEDERAL — $87.5 MILLION
BONDS — $525.0 MILLION
Stote-$100 M FEDERAL —$1I25 MILLION
Bonds-$50M BONDS — $225 MILLION
SECOND FIVE YEARS - $700 MILLION
STATE HIGHWAY $525 MILLION STATE AID P
S150 daitlio: BONDS $25 MILLION
STATE — $112.5 MILLION
Stote-$100M
FEDERAL — $87.5 MILLION Bonds-$50M
BONDS — $325.0 MILLION
GOVERNOR’S COMMISSION TO EVALUATE CAPITAL NEEDS OF NEW JERSEY
THE PUBLIC APPROVED...
$640 MILLION
PUBLIC TRANSPORTATION
$200 MILLION
HIGHWAYS
$440 MILLION
THE DEPARTMENT’S CAPITAL PROGRAM FOR FISCAL 1969...
Public Transportg,.
10n
2404S
HIGHWAY BONDS
$195.0 MILLION
FEDERAL
SHARE
$110.5 MILLION A 35.6% v
20.3% cl
o
ist
a
UNEXPENDED BALANCES
REPROGRAMMED
$125.9 MILLION
$22.5%
1969
CONSOLIDATED TRANSPORTATION
$551.8 MILLION
CONSTRUCTION PROGRAM
This consolidated Construction Program has been prepared pursuant 1969 CONSTRUCTION PROGRAM
to the provisions of c. 424, P.L. 1968, which appropriated to the Depart- ee a a NS RR SS ER
ment of Transportation the initial allocation of funds from the State Trans- FISCAL SUMMARY
portation Fund. In addition to allocating funds provided from the Transpor- aa aaa
tation Bond Issue approved last November, this consolidated Construction
Program also details the allocation of funds previously available to the De-
partment as well as those funds available on a Federal-State matching basis. Existing Balances to be Reprogrammed
It, therefore, updates all previous construction programs. Soe Ra teh 9; a Igreean a
Interstate (90-10) $125, 962,226
The fiscal summary indicates that the Department has allocated to Primary-Urban (50-50) 7,373, 208
it for highway purposes $215 million in bond funds and $268,896, 907 in Non-Federal 295155335
other Federal and State funds. It is not anticipated, however, that all of
these funds will actually be available to the Department for highway pur- Total $135,850, 769
poses during 1969. For example, of the total amount in Federal and State
funds, $102, 898,054 represents Federal aid for which corresponding State
matching funds are not now available to the Department. This amount has New Appropriations
not been programmed in detail and is not actually available for expenditure
purposes at the present time. Federal Funds
In addition, because of limitations imposed by the Federal government Interstate (90-10) $110, 556,400
upon the Department with regard to the obligation of Federal funds through Primary-Urban (50-50) 187509225)
June 30, 1969, it will not be possible to obligate or commit more than $90 Primary-Rural (50-50) 1,021,363
million of the Federal funds now apportioned to the Department during this Topics 2,593,603
period. The amounts available to the Department for obligation through
June 30, 1969 are as follows: Total $132,680,617
February, 1969 $ 2,212,000 State Funds
March, 1969 15,142,000
April, 1969 15,596,000 Bond Issue - Highways $215,000, 000
May, 1969 15,596,000 Planning Costs 428,701
June, 1969 16,431,000 Sa.
TOTAL 3/15/69 ~ $64,977,000 La naa
GRAND TOTAL $483, 960, 087
THE FEDERAL FREEZE
JANUARY 25, 1968
TOTAL FEDERAL FUNDS AVAILABLE ON 1/25/68
$240.3 MILLION Balance from Previous Fiscal Years $124.1 Million
1969 Federal Apportionment 116.2 Million
HOWEVER, Department was permitted to obligate
only 95% of amount expended in 1967 ($114 MILLION)
95% OF $114 MILLION BALANCE OF $240.3 MILLION THAT REMAINED **FROZEN”’
$108.3 MILLION $132.0 MILLION
FROZEN BALANCE FISCAL 1970 APPORTIONMENT ADDED 10/31/68
TOTAL AS OF 10/31/68
132.0 MILLION $129 MILLION $261.0 MILLION
DEPT. PERMITTED TO OBLIGATE
$90.4 MILLION ON 11/7/68 BALANCE AWAITING FULL OR PARTIAL RELEASE
3/15/69 25,487,000
ee , $170.6 MILLION
Balance to 6/30/69 64,977,000
LOCAL GOVERNMENT AID BUDGET, 1968-69
$32,080,000
“d3ad0 “AIG
%¥°T 000'062$
COUNTY AID
$9.155 MILLION
28.5%
STATE AID ROAD SYSTEM
$15 MILLION
47%
COUNTY & MUNIC. LIGHTING
ROAD DAMAGE
$100,000
0.3%
MUNICIPAL AID
$6.600 MILLION
20.5%
COUNTY AID
The Legislature appropriates funds for this
program to aid counties in construction, re-
construction, maintenance, lighting, repair
and policing of roads and bridges. The money
is based on a population, road mileage and
area formula.
MUNICIPAL AID
Allotments are made from this fund based on
population, need and road mileage. It is to
be used for construction, maintenance, light-
ing, and purchaseof snow removal equipment.
In addition, funds are provided to each county
to be used by the municipalities for road and
bridge improvement projects only.
COUNTY & MUNICIPAL LIGHTING
Enables the state to participate with county
and municipal governments, in the cost of
maintenance of highway safety lighting along
state highways at intersections of county
and municipal roads, railroad crossings,
dangerous curves and headwalls.
STATE AID ROAD SYSTEM
Grants from this fund go to counties and
municipalities for construction, reconstruction
and improvements to roads and bridges selec-
ted for an integrated road network, which
supplements and complements the state high-
way system.
ROAD DAMAGE
Funds are provided annually for reconstruction
of county and municipal roads damaged by
vehicles weighing 40,000 pounds or more and
bearing ‘*Constructor’’ registration license
plates.
LOCAL GOVERNMENT AID BUDGET, 1969-70
$32,312,336
9EE'71L6$
‘dddO ‘Ald
%8'°
COUNTY AID
$9,155,000
28.3%
STATE AID ROAD SYSTEM
$15,000,000
46.5%
ROAD DAMAGE
$200,000
0.6%
MUNICIPAL AID,
$6,600,000
20.4%
we
COUNTY & MUNIC. LIGHTING
COUNTY AID
The-Legislature appropriates funds for this
program to aid counties in construction, re-
construction, maintenance, lighting, repair
and policing of roads and bridges. The money
is based on a population,.road mileage and
area formula.
MUNICIPAL AID
Allotments are made from this fund based on
population, need and road mileage. It is to
be used for construction, maintenance, light-
ing, and purchase of snow removal equipment.
In addition, funds are provided to each county
to be used by the municipalities for road and
bridge improvement projects only.
COUNTY & MUNICIPAL LIGHTING
Enables the state to participate with county
and municipal governments, in the cost of
maintenance of highway safety lighting along
state highways at intersections of county
and municipal roads, railroad crossings,
dangerous curves and headwalls.
STATE AID ROAD SYSTEM
Grants from this fund go to counties and
municipalities for construction, reconstruction
and improvements toroads and bridges selec-,
ted for an integrated road network, which
supplements and complements the state high-
way system.
ROAD DAMAGE
Funds are provided annually for reconstruction
of county and municipal roads damaged by
vehicles weighing 40,000 pounds’or more and
bearing ‘Constructor’ registration license
plates.
DEPARTMENTAL OPERATING BUDGET )1968-69"
0$87/800,000
MAIN TENANCE
| eee S206
234s
a STATE SORERATING
eee Ee)
300,906 XE
MNES EAS
AERONAUTICS
$0.27
0.3%
RAILROAD Bia -
————SCOMMUFER-AID Z So
Yee eae Fm TRAFFIC.ENGINEERING !
SMIDMS LPRAA ee
000,008 be
2DITUAVOHAA
|
000, 0€¢8.02
STATE AID,
$32.0.
36.4%
Corrigenda
Page 6a
Change Maintenance sum to
Change State Aid sum to
Change Railroad Commuter Aid to
$23,400,000
$32,300,000
$10,700,000
STATUS OF
INTERSTATE SYSTEM
APRIL 1969
Z
Q “
\
Rens 53 PP on | a
oe x.
ow AR) Roe Nee nee nip "a
fa ( (10)
MO OR R
Z Pench
il ee alg
« r Ne Cer hdr J
og ae:
Easivn
Philipsbere { Ne
( ) - )
f
w
Ske
i
grey eee
wt
tape
6
r
i °)
Hh UN Neh £ OR STATEN
a —. o- ISLAND /
= Semarniite fo /
«
yy
‘y
+f
LEGEND
sseeuees UNDER STUDY NS
ALIGNMENT RECOMMENDATIONS SS
TO THE BUREAU OF PUBLIC ROADS <
ween, DESIGN AND RIGHT OF WAY <\ tieoh Me A
Te UNDER CONSTRUCTION \ & ‘Poa
memes OPEN TO TRAFFIC Sh 6 — Cima oy S habury Paik
fi =\ / ()
PHILADELPHIA
LF
nh Meine
EUs » Ht
s
aye
y S in Ll
SS, be (/ Shi Ratton
S ACYL mu oY/
J Bea
Nyphy Salem
rol ~
INTERSTATE MILEAGE
ROUTE smmmn ime oe, joven
woes TOTAL
7% | 00 00 | 24] 02 37 | 63
78 24| oo | 18 | 161 359 | 662
| | |
80 0.0 oo | 21.2) 214 | 255 | 681
95 0.0 124 194 19 | 408 | 74.2
195 13.5 0.0 | 17.2 3.7 00 344
278 00 00 0.0 WwW 09 2.0
280 00 0.0 65 10.5 WwW 184
287 00 00 22.8 5.9 34.2 62.9
295 oo | 00 31.3 | 0,0 406 | 719
495 00 0.0 00 0.0 | 24 24
676 00 | «(00 0.0 0.0 wW Ww
|
895 45 00 00 oo | oo | 45
TOTAL 204 124 132.3 60.8 1859 4118
DEPARTMENTAL OPERATING BUDGET, 1969-70
$90,700,000
MAINTENANCE
$32,300,000
25.8%
STATE OPERATING
$12,500,000
RAILROAD
COMMUTER AID
$10,800,000
11.9%
AERONAUTICS
$0.230,000
0.2%
TRAFFIC ENGINEERING
$4,800,000
STATE AID
$32,3000,000
35.6%
Biter ose 809 ever 1243 vor
Hk yf a fk
te | ee | oo oo | oo | oo 9L9
ie 4 in 4 | oo oo | 00 | 00 Gor
ou | 90% | oD ee | 00 00 soe
ozo | eve | os | oez | oo | 00 | sez
er te so $9 oo | oo oe7z
ot 60 " 00 00
wre 00 Le | wut
00 ale
4
)
stl | Sot
vee | BOP | os | lke tL | 00 s6
veo | ssz | wiz | cz | oo | oo | o8
veo | Ose | VOR | Ob | 00
eo | ce | zo | ve | oo oo | u%
|
Iwiol — ‘aman arcana) 0010! 0 em 21n04
JOVITIW FLVISHIINI
ve BL
nani
penenia \v
“// \INd1BOVTING
4
Ys
0 a
rasta eb,
° M
/
\
card
itd ny
D14iV4l OL NId0
NOILDNYLSNOD YIGNN_ inne
AVM 4O LHOIN ONY NOISIO weoerw
savow 3I18Nd 4O NVIYNE FHL OL
ae LNSWNSITV [simyeiss
\
AQNLS Y3GNN "se8e88
QN3931
fie]
Sy
mee Te
Ne Ya 2 N A OA
o /
Z
Xs) ’ 0 a
we : " C
r y af
aon
(a) ij. (as)
696L WudV
WALSAS JLVLSYFINI
4O SNLVLS
Interstate Route 295
Interstate Route 7G
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Morgan Blvd. to Atlantic Avenue Atlontic Avenue to Federal Street Federal Street to Bridge Plaza
©
D
a)
ik
a
~ c
5 =
> 4 ~
= > = c
= o ro 5
> © © ° 9
3} > as Y a
Ps a < a -
= c = oo AS
é § s 6 8 2 5 Eo
— ae +70 3 © o>
= Mey fs =z € 3 7 ie
© 6.8 o 6 © iS o 5
a =v ra (a, w =I a O
DESIGN AND RIGHT OF WAY DESIGN AND RIGHT OF WAY
UNDER CONSTRUCTION .2 MILE OPEN 1.0 MILE
OPEN 2.7 MILES 1.9 MILES -5 MILE
CAMDEN COUNTY |
State—Federal Cost to Date: $14,514,518 INTERSTATE ROUTE 76 — Length: 6.3 Miles
Estimated Cost to Complete: $24,127,517
Wi : : ?
Total Cost: $38,642,035 ill provide a direct express link north from Route 295
in Camden County to the Walt Whitman Bridge and the
City of Camden. The Freeway then crosses the Benjamin
Franklin Bridge into Philadelphia.
Phillipsburg
Still Valley
PRELIMINARY
OPEN
STUDY
26.3 MILES
2.4 MILES
WARREN COUNTY | HUNTERDON
COUNTY
State—Federal Cost to Date: $185, 191,851
Estimated Cost to Complete: $136,940,514
Total Cost: $322, 132,365
Interstate Route 78
Interstate Route 287
12.6 MILES
SOMERSET COUNTY
UNDER CONST.
PROJECTS BEING DESIGNED FOR CONSTRUCTION
is
© a
“
rs $
2 3 0
< ‘0 oF
oat [0A]
otc Car)
2 0 es
- 7 oe
cee Qa
ces c £
2 =] c=
a = 2
adm nn
DESIGN AND
RIGHT OF WAY *
5.8 MILES
| UNION COUNTY
* Construction of this section awaits
finalization of agreement with the
Union County Park Commission.
UNDER CONST.
2.0 MILES
Shunpike Road to Springfield Avenue
Shunpike Road to Morris Avenue
Route 24 to Springfield Avenue
Springfield Avenue to Ramsey Avenue
Ramsey Avenue to Shaw Avenue
Shaw Avenue to East of Waverly Viaduct
Route 75 Interchange
Elizabeth Avenue to Frelinghuysen Avenue
LVRR to Elizabeth Avenue
©
=
c
9.2
=r
<<
Cc
a
oo
al
n
c
To
ae
a.
nD
DESIGN AND
RIGHT OF WAY
wo
“ a
ww
5 £~e z
no o = c
faa fe a: =
x As =
7 |
=< oy Fas 3 a
rs dS S
© L
SS o.) 2 =
a) SO °
=i 4 Un aera Eo
UNDER CONST. OPEN (TOLL)
1.5 MILES 9.6 MILES
6.0 MILES
ESSEX COUNTY HUDSON COUNTY |
INTERSTATE ROUTE 78 — Length 66.2 Miles
This Freeway will provide an express highway for transcontinental
traffic crossing the state from Phillipsburg to the Newark metro-
politan area and the Holland Tunnel. It will divert cross-country
traffic from Route 22, permitting that primary highway to fulfill its
design function as aland service road, and facilitate the flow of
local and commuter traffic.
Interstate Route SO
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Cherry Hill to Mazda Brook Road
Rte. 53 to Cherry Hill Road
Waterloo Lakes to Netcong
Allamuchy to Waterloo Road
Columbia to Hope Twp. Line
Passaic River to Paterson
Adv. for Construction 2/20/69
Jackson Street to Grand Avenue
Delaware Water Gap Bridge
Parsippany—Troy Hills Township
Vicinity Route 94
Allamuchy Township
Interstate Route 95
Route 519
Hope Township
Route 517
Flanders Road
Smith Road
McBride Avenue
West Paterson
Main Street
Paterson
Beckwith Avenue
Teaneck
Columbia
Route 46
Route 46
Denville
Route 53
Denville
Paterson
DESIGN AND UNDER DESIGN AND UNDER DESIGN AND UNDER DESIGN AND UNDER
OPEN UNDER OPEN OPEN
CONST.
RIGHT OF WAY CONST. RIGHT OF WAY CONST. RIGHT OF WA CONST. RIGHT OF WAY
CONST.
4.1 MILES 12.3 MILES 9.1 MILES
-2 MILES
8.6 MILES 7.4 MILES 6.1 MILES .7 MILES 4.5 MILES 12.4 MILES 2.0 MILES .7 MILES
WARREN COUNTY | | MORRIS COUNTY | | P ASSAIC COUNTY |
SUSSEX
COUNTY
ESSEX
COUNTY
BERGEN
COUNTY
State—Federal Cost to Date: $216,917, 168 INTERSTATE ROUTE 80 — Length: 68.1 Miles
Estimated Cost to Complete: $ 90,823,230
Total Cost: $307,740,398
Easternmost portion of the transcontinental freeway from San Francisco
to a point four miles west of the George Washington Bridge. (Interstate
Route 95 continues to the bridge.) In New Jersey, Route 80 will relieve
Route 46 of through traffic, thereby benefiting local and commuter traffic.
10
Delaware River
Interstate Route 95
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 546 to Elm Ridge Road
a
© ed
D 7) nm
me] te c co
Fe i > N
2 ° ae)
a c = ioe roo
“ 3 > 0
= ° as Ol
3 BE D © i <
uw o stia o 3 oc
Yr — re Peyies +o
o Q Loo Sa tyes
4a ne ae =
me] O o ae
me) oO + Rice £ >
3 one z= os 3 oO
o o = }
72) nL [ease EW =
DESIGN AND
OPEN OPEN
ALIGNMENT
RECOMMENDED
TO B:PiR:.
12.4 MILES
RIGHT OF WAY
2.9 MILES 3.6 MILES
18.8 MILES
| MERCER COUNTY | SOMERSET MIDDLESEX COUNTY
COUNTY
State—Federal Cost to Date: $ 66,633,268
Estimated Cost to Complete: $112,853,544
Total Cost: $179,486,812
11
Route 440 F and
N.J. Turnpike
OPEN
(TURNPIKE)
30.1 MILES
Route 46 to Route 80
Ady. for Construction 3/6/69
o ©
S S
5 5
3 <=
u uu
~ 2
© 2 5
= c a
is = =
wo 0 oO
Se °
1 1 = c
Bu = =
hs Le o &
=
35 35 3 =
o _o x m7
w-o Bw A s
=0 =e io
= = - © ©
eae we haere “=
Se 5S only oo a
a one = © ©
rev rer —-F (e)
DESIGN AND UNDER
OPEN
RIGHT OF WAY CONST.
4.2 MILES
3 MILE 1.2 MILES
JUNIoN, ESSEX | BERGEN COUNTY |
HUDSON COUNTIES
INTERSTATE ROUTE 95 — Length: 74.2 Miles
This Maine-to-Florida freeway crosses the George Washington Bridge into
New Jersey, follows the New Jersey Turnpike south to Metuchen, then turns
east to the South Plainfield area. The alignment then turns south through
Somerset and Mercer Counties and crosses the Delaware River into Pennsyl-
vania north of Trenton. The New Jersey portion will provide a direct bink
between the Philadelphia Metrolpolitan area and the Newark—New York area,
and relieve traffic pressure on Routes 206, 27, 1, and 130.
Interstate Route 195
PROJECTS BEING DESIGNED FOR CONSTRUCTION
East of Route 295 Int. to West of Route 206 Imlaystown — Hightstown Road to Burke Tavern Road
Route 206 to Route 37 Route 537 to Route 527
Route 37 to US Route 130
US Route 130 to Route 539
3
= °
S fo
a ¢€..£
oe zoe
es = ee 2s
ne es =.0 o
= c
24 ~ 3 Be =
ss oO -_ O ”
o 2 Da Is iS os
x 0 Boe fer 2 =
© 2 $3 2 c
c = S s
Bo = en oun Nie + 3
-+ o £ + wo oO 90
a= = a 3
—— ~ xo >~s on oF
B= 28 o 3 $3 $=
c => E 2 oo oD
—= oO =} ea es
DESIGN AND RIGHT OF WAY UNDER CONSTRUCTION DESIGN AND RIGHT OF WAY PRELIMINARY STUDY
3.7 MILES 9.0 MILES 13.5 MILES
8.2 MILES
MERCER COUNTY MONMOUTH COUNTY | OCEAN COUNTY heateaee COUNTY
INTERSTATE ROUTE 195 — Length: 34.4 Miles
This new addition to the New Jersey portion of the
Interstate System will provide direct access to the
State—Federal Cost to Date: $ 5,828,730
Estimated Cost to Complete: $48,671,270
Total Cost: $54,500,000
shore areas from Delaware Valley communities. The route
was added to the system after Union County citizens
rejected the proposal to extend Interstate Route 278
northwest from Route U.S. 1 & 9 to a connection with
1-78. It is proposed to connect |—195 with a north-
south thruway from the Woodbridge area to Toms River
(to be built by the New Jersey Highway Authority).
12
Route 1 and 9
Linden
Interstate Route 278
Bridge Approach
Linden
UNDER CONSTRUCTION 1.1 MILES
Goethals Bridge
Elizabeth
OPEN. .9 MILE
State—Federal Cost to Date:
Estimated Cost to Complete:
Total Cost:
$13,872,777
$ 1,745,000
$15,617,777
UNION COUNTY
13
INTERSTATE ROUTE 278 —- Length: 2.0 Miles
This route will carry traffic generated in New York
City boroughs, coming across the Verrazano Narrows
Bridge into Staten Island and over into New Jersey on
the Goethals Bridge. It will provide direct connections
to the New Jersey Turnpike, Route U.S. 1 & 9, and future
Route 81 Freeway.
Interstate Route 80
Interstate Route 280
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Troy Meadows to Passaic River TalinvAwenuertorscatiand Road Grant Avenue to
Roosevelt Avenue to East of Scotland Road Harrison Avenue
Parsippany—Troy Hills Township
ive)
5 ron
0 o
— 2 cond
: 65 o 2 s o c =) 0
> Sa > o o = 5 o Ore
= aie co 2 o c z Yo
= [esa Oc a4 > © < c
= oa > 5 <t > oe
© = ee te mo] qs Cc $6?
= 3 x fo) - c 9 S > Se >
~ “vo Qe = ge pared ae aa S
2 cae = ° = bf. f= re ate} 5.45
= ou > 0 oO = . 0 So ©o =o 0
= ow [=== n O (6) Ge Baa Sosy
DESIGN AND UNDER
DESIGN AND UNDER
UNDER
DESIGN AND
UNDER
RIGHT OF WAY CONSTRUCTION RIGHT OF WAY CONSTRUCTION
CONSTRUCTION
RIGHT OF WAY OPEN 1.1 MILES
CONSTRUCTION
2.1 MILES 1.3 MILES
1.7 MILES
5.3 MILES 3.4 MILES
2.7 MILES
-5 MILE
ESSEX COUNTY | HUDSON COUNTY
MORRIS COUNTY |
State—Federal Cost to Date: $111,072,693 INTERSTATE ROUTE 280 — Length: 18.1 Miles
E temated Cost t= Comploter$ 45,827,296 A branch of Interstate Route 80 which will provide an expressway from
Total Cost: St O77,7 27 rapidly developing eastern Morris County through the densely populated
areas of the Oranges and Newark in Essex County and heavily industrialized
Harrison and Kearny in Hudson County. The freeway will extend from parent
Route 80 in Parsippany—Troy Hills Township, Morris County, to Interstate
Route 95 (New Jersey Turnpike) in Kearny.
14
Interstate Route 95
South Plainfield
Interstate Route 287
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Morristown Erie RR to Route 10
Passaic River to Route 10
North Maple Avenue
Bernards Township
Morris Avenue
Hanover Township
Route 202 (Main Road)
Montville Township
Mahwah Township
New York State Line
Suffern
Morristown
Route 10
Route 17
UNDER CONSTRUCTION DESIGN AND RIGHT OF WAY DESIGN AND RIGHT OF WAY
OPEN 26.1 MILES OPEN 7.4 MILES OPEN .7 MILE
18.9 MILES
5.9 MILES 3.9 MILES *
=~ SOMERSET COUNTY MORRIS COUNTY PASSAIC BERGEN COUNTY
2 > COUNTY
ay ey
as
= e State—Federal Cost to Date: $105,945,252 * This portion is ready for advertising INTERSTATE ROUTE 287 — Length: 62.9 Miles
Estimated Cost to Complete: $129,034,238 for construction purposes, but is awaiting
A belt highway which encircles metrolpolitan northeast New Jersey.
Potales typo aa! ware agreement with the Morris County P ark It stems from the New York Thruway near Suffern, New York, extends
Commission. through Morristown and the heavily industrialized and populated
Somerville—Bound Brook areas, and meets Interstate 95 in South
Plainfield. Route 95 then extends east to the New Jersey Turnpike
near Metuchen, which becomes Route 95 north to Route |—80. At
Metuchen, Route 95 also joins Route 440 Freeway which extends
east through Perth Amboy to the Outerbridge Crossing Bridge and
Staten | sland.
15
Delaware Memorial Bridge
OPEN. 40.6 MILES (1.0 MILE TOLL)
Interstate Route 295
Mount Laurel Township
Route 38
| SALEM, GLOUCESTER, CAMDEN COUNTIES
State—Federal Cost to Date: $ 79,775,184
Estimated Cost to Complete: $113,357,392
Total Cost: $193,132,576
16
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 38 to North of Rancocas Creek Kinkora Railroad
North of Rancocas Creek to North of Dunns Mill Road to
North of Burlington-Mount Holly Road Crosswicks Creek
North of Burlington-Mount Holly Road to Crosswicks Creek to Independence Avenue
South of Burlington-Columbus Road Independence Avenue to Kuser Road
South of Burlington-Columbus Road to
South of Hedding Road
South of Hedding Road to
North of Dunns Mill Road
Kuser Road to Bear Swamp Road
Bear Swamp Road to US Route 1
US Route 1 to Federal City Road
Burlington-Mount-Holly Road to
Dunns Mill Road
Interstate Route 95
Hopewell Township
DESIGN AND RIGHT OF WAY 31.3 MILES
BURLINGTON COUNTY | MERCER COUNTY |
INTERSTATE ROUTE 295-— Length: 71.9 Miles
Will serve the New Jersey side of the Delaware River as its parent highway,
Interstate Route 95, serves the Pennsylvania side. Route 295 crosses the
Delaware Memorial Bridge into Salem County and follows a course west of
the New Jersey Turnpike through the Camden metropolitan area, curves
around Trenton and rejoins Route 95 in Hopewell Township, Mercer County.
Interstate Route 95
Secaucus
Estimated Total Cost:
$25,000,000
Interstate Route 495
OPEN. 2.1 MILES
HUDSON COUNTY
17
INTERSTATE ROUTE 495 — Length: 2.1 Miles
This is the New Jersey approach to the Lincoln Tunnel.
New Jersey received an allocation of Interstate mileage
in order to upgrade this highway to Interstate standards.
The entire route extends from Interchange 16 of the N.J.
Turnpike in Secaucus through the Lincoln Tunnel, across
New York City until it joins and follows the Long Island
Expressway.
Pleasant Avenue
Weehawken
Walt Whitman Bridge
Gloucester City
Interstate Route SG7G
OPEN. 1.1 MILES (TOLL)
Interstate Route 76
Camden
Constructed by the Delaware River Port Authority.
CAMDEN COUNTY
18
INTERSTATE ROUTE 676 — Length: 1.1 Miles
This is the mile-long link from Route 76 west to the Walt
Whitman Bridge which gives access to south Philadelphia,
the Philadelphia International Airport and Navy Yard.
Pa. —N. J. States Line
New Burlington — Bristol Bridge
Interstate Route 895
Interstate Route 295
Westampton Township
PRELIMINARY STUDY 4.5 MILES
Estimated Total Cost:
$29,000,000
BURLINGTON COUNTY |
INTERSTATE ROUTE 895 — Length: 4.5 Miles
This freeway was added to the system in October, 1968 as
a result of the Department's efforts to resolve a dispute be-
tween the Delaware River Joint Toll Bridge Commission and
the U.S. Bureau of Public Roads. This addition replaces a
proposed toll bridge and will provide the only free Delaware
River crossing south of Trenton.
19
INTRASTATE FREEWAYS
APRIL 1, 1969
New
Hroniwice
NY
YiLy;
aN
C i @
Princeton, d ~~
LEGEND ureya“ E Pe
tameme: PRELIMINARY STUDY N
exewue. DESIGN AND RIGHT OF WAY
SC UNDER CONSTRUCTION
ewes OPEN TO TRAFFIC
20
le
STATUS OF INTRASTATE FREEWAYS
PRELIM. DESIGN & OPEN
STUDY ROW
33
35
38
40
55
72
74-9
75
81
85
90
92
174
178
202
206 Atl.
206 Sus.
208
322
440 Hud.
440 Mid.
807
Foothills
Freeway
TOTALS
Woodport
Jefferson Township
MORRIS COUNTY
Estimated Total Cost: $22,000,000
Route 15 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Lake Forest Drive to Blue Heron Road
Blue Heron Road to NYS and WRR
Ross’ Corner
Frankford Township
Route U.S. 206
DESIGN AND RIGHT OF WAY 11.0 MILES
SUSSEX COUNTY |
ROUTE 15 FREEWAY — Length: 11.0 Miles
With the opening of the Delaware Water Gap recreational area
in 1975, this freeway will be vitally needed. It will also serve
to relieve the thru traffic congestion on existing Route 15.
22
New Street
| MIDDLESEX COUNTY |
Route 18 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
New Street to George Street George Street to Sutphen Road
- 2
£ i=
7 5
c c
8 a}
°
6 - Ne
= x te
6 ew / 9
ic has = 2
2 Yr 2 2
=
faa} elo 2s
S 3 é
a. &
z Zot
ys Yo Yr ©
PRELIMINARY STUDY 6.1 MILES
(No public hearing held)
DESIGN AND RIGHT OF WAY 2.2 MILES
SOMERSET COUNTY
Estimated Total Cost: $45,000,000 ROUTE 18 FREEWAY ~—- Length: 8.3 Miles
This north-south artery is needed to provide improved
access to New Brunswick, a new crossing of the Raritan
River, connections to Routes I-95 and |—287 and N.J. 28,
and to ultimately serve interregional traffic in the corridor
from north central New Jersey to the north Jersey shore.
23
Route 35 Freeway
Route 18 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 35F to Normandy Road Normandy Road to East of C.R.R. of N.J. East of C.R.R. of N.J. to US Route 9
- Qa
<
”
is
ue
3 We
° ve
= aes
2 £2
=)
to] ry al
am“ es
DESIGN AND RIGHT OF WAY 17.1 MILES
MONMOUTH COUNTY MIDDLESEX COUNTY
Estimated Totai Cost: $33,000,000 ROUTE 18 FREEWAY — Length: 17.1 Miles
This artery will connect existing land-service Route 18 with
Route 35 Freeway in the vicinity of the Garden State P ark way
spur in Eatontown. It will ultimately serve interregional traffic
in the corridor from north central Jersey to the north Jersey shore
and provide connections to Routes 78 and 34.
24
Route U.S. 46
Clifton
Route 20 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Valley Road to Oliver Street
Oliver Street to Erie RR
Erie RR to McLean Blvd.
First Avenue and McLean Blvd.
Valley Road
Paterson
Paterson
UNDER CONSTRUCTION
1.8 MILES DESIGN AND RIGHT OF WAY 3.2 MILES
PASSAIC COUNTY |
Estimated Total Cost: $53,000,000 ROUTE 20 FREEWAY -— Length: 5.0 Miles
This Route will connect Route 46 in Clifton and Route 20 in
Paterson, Passaic County. It will be a peripheral highway
around Paterson, a much needed highway to relieve traffic in
this area and will interchange with Route 80 in Paterson.
25
Route 21 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Lafayette Street to Bridge Street Lakeview Avenue to Route 20 Int.
Lofayette Avenue to Monroe Street
Monroe Street to Clifton Avenue
Clifton Avenue to Market Street (Route 80)
Passaic River Crossing Structure
Lafayette Street
Interstate Route 80
East Paterson
Passaic
Bridge Street
Newark
Clay Street
Newark
DESIGN AND RIGHT OF WAY PRELIMINARY STUDY DESIGN AND RIGHT OF WAY
OPEN 8.3 MILES
1.0 MILE zo MILE 3.8 MILES
| PASSAIC | BERGEN
COUNTY COUNTY
ESSEX COUNTY PASSAIC COUNTY |
BERGEN
COUNTY
Estimated Total Cost: $82,000,000
ROUTE 21 — Length: 13.6 Miles
This Route will connect Route 21 in Newark
and I-80 in East Paterson. It will relieve
north- south traffic in this congested area.
26
Route 24 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Brooklake Road to Passaic River
Erie—Lackawanna RR and Passaic River
Passaic River to Canoe Brook Road
Passaic River to Erie~Lackawanna RR
Baltrusrol Avenue to Erie—Lackawanna RR
is)
ro]
°
2
‘o
a “ ©
is o ~
oe
c
nv
c = 2
id >
~o 3 > 3
2 eae 3 ra
: cs <
ao) U o—
a Reds te} = 0
Qa on j= Ss
5 = = -
= A | an)
= on vo 5 HS
= one OTE o>
a] eG Ps =o
a [= == wn we
UNDER CONSTRUCTION
1.0 MILE
(1-78 CONTRACT)
PRELIMINARY STUDY
34.3 MILES
(NO PUBLIC HEARING HELD)
DESIGN AND RIGHT OF WAY
13.0 MILES
WARREN HUNTERDON COUNTY MORRIS COUNTY ESSEX—UNION COUNTIES
COUNTY
Estimated Total Cost: $150,000,000 ROUTE 24 FREEWAY — Length: 48.3 Miles
This artery will connect Route 1-78 in Union County with
Route U.S. 22, Phillipsburg, Warren County. It will relieve
existing Route 24 which is totally inadequate for the traffic
in this corridor.
27
x
N
©
-
=
°
x
c
3
°
=
v
+
=
©
x
¥
iS]
x
WARREN COUNTY
Estimated Total Cost: $2,500,000
Route 24-46 Freeway
Route 24—46 Connector
Washington Township
Route U.S. 46
DESIGN AND RIGHT OF WAY 1.2 MILES
MORRIS COUNTY
ROUTE 24-46 CONNECTOR ~- Length: 1.2 Miles
This proposed connector will eliminate the difficult
turning movements necessary now because of the
angle of connection between Routes 24, 46 and 57
in Hackettstown. It will do much to relieve traffic
congestion.
28
Route 29 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
West of Watson's Creek to, but
excluding, Route 295 Interchange
Lalor Street to West of Watson's Creek
Federal Street to Lalor Street
©
wo D>
na pe)
ane ee
24 =a 2
2 § AS
9 AS o w-—c
w 0 o o 5 3
o o = ou o
6 5 = a ea
° n Cc c - ©
ee ° =o "5 OD
7 mS se
~e fee FS ot -—a5 Cc
o£ = 5 = 6 Egor
- § Cas ae cu
35 a =r —w WwW
DESIGN AND RIGHT OF WAY 4.4 MILES UNDER CONSTRUCTION 1.1 MILES OPEN 3.8 MILES
MERCER COUNTY
Estimated Total Cost: $34,000,000 ROUTE 29 FREEWAY - Length: 9.3 Miles
This Route will ultimately provide a badly needed artery for
the free flow of north-south traffic to the State Capital. At
its south-eastern terminus it will connect with Interstate
Route 295 and hence become a part of the Central Jersey
Expressway.
29
Benjamin Franklin Bridge Plaza
Camden
Route 3O Freeway
DESIGN AND RIGHT OF WAY .5 MILE
Route U.S. 30
Camden
Estimated Total Cost: $5,000,000
CAMDEN COUNTY
30
ROUTE 30 FREEWAY — Length: .5 Mile
This east-west connector has been coordinated with the
urban renewal program in the City of Camden. It will
provide a wider traffic route than the present existing
city streets to feed traffic to and from the Benjamin
Franklin Bridge Plaza.
Brunswick Avenue Circle
Route U.S. 1
Slack wood
Route 31 Freeway
Route 31 Circle (Pennington)
Hopewell Township
DESIGN AND RIGHT OF WAY 5.5 MILES
Estimated Total Cost:
$2,500,000
MERCER COUNTY
ROUTE 31 FREEWAY — Length: 5.5 Miles
This freeway will connect the Route U.S. 1 circle in
Slackwood with the Pennington Circle in Hopewell Town-
ship, a distance of 5.5 miles. A substantial amount of right-
of-way has been purchased. The route is one of the radials
connecting the loop freeway with the urban center street
system.
31
Manalapan Brook
Manalapan Township
Estimated Total Cost: $8,500,000
Route 33 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Manalapan Brook to East of Route 79
East of Route 79 to Route 33
Freehold Township
Route 33
DESIGN AND RIGHT OF WAY 7.0 MILES
MONMOUTH COUNTY
ROUTE 33 FREEWAY — Length: 7.0 Miles
This is the proposed Freehold bypass. It is a link in the
Central Jersey Expressway System on new alignment
bypassing the Monmouth County seat, thereby permitting
free flow of traffic, while simultaneously improving access
to and reducing congestion in that area.
32
Route 34
Route 35 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Deal Road to Parkway Spur
Brielle Circle to 18th Avenue
Qa
i
a = a
-_ =)
Be = va i a
2 H O 33 ie
0 @ 3 Oo oF =
0 c ~ 3 €
o a © 5 § =
3 $= ane = = 5
< 35 oo ou 63
oO “> “Zz a0 aw
UNDER CONSTRUCTION DESIGN AND RIGHT OF WAY
2.8 MILES
OPEN. 4.1 MILES
DESIGN AND RIGHT OF WAY
4.0 MILES
2.8 MILES
MONMOUTH COUNTY
Estimated Total Cost: $24,000,000 ROUTE 35 FREEWAY — Length: 13.7 Miles
This Freeway is on new alignment and is needed to provide a
route with freeway characteristics which will relieve existing
Route 35. The present land-service road, most of which is three-
lane, is congested and hazardous due to traffic generated by army
installations, shopping facilities and coastal resorts. In addition
to by-passing heavily developed areas, the freeway will provide
connections to east-west Routes 38, 33, 66, 18 and the Garden
State Parkway spur at Eatontown.
33
Interstate Route 295
Route 38 Freeway
2
—<
= o
$ = 2
<=
° 2a
oma 2
= °
© & io
~
> or
. +
5 eC
4 =" 10)
vw
4 _
5 23
° £4.9
2 £
PRELIMINARY STUDY 33.5 MILES
BURLINGTON COUNTY OCEAN COUNTY
Estimated Total Cost: $60,000,000 ROUTE 38 FREEWAY — Length: 33.5 Miles
At present there is no high-speed direct access
between the Camden-Philadelphia urban area and
the northern sections of the Jersey shore. This will
provide such a connection.
34
Route U.S. 9
Route 55 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 47 to Landis Avenue
Landis Avenue to Garden Road
Route 40 to Route 47
Garden Road to Route 40
Vicinity of Swainton
Port Elizabeth
Millville—Vineland Line
Franklinville
Route 42
Westville
UNDER CONSTRUCTION DESIGN AND RIGHT OF WAY PRELIMINARY STUDY 17.0 MILES
PRELIMINARY STUDY
17-0 MILES 8.0 MILES 15.0 MILES
(NO PUBLIC HEARING HELD)
CAPE MAY COUNTY CUMBERLAND COUNTY
GLOUCESTER COUNTY
SALEM
COUNTY
Estimated Total Cost: $78,000,000 ROUTE 55 FREEWAY — Length: 57.0 Miles
This Route will extend from Route U.S. 9 in the vicinity of
Swainton, Cape May County to Route |—295 at Westville,
Gloucester County, on new alignment.
35
]
Route U.S,
Elizabeth
PRELIMINARY STUDY 2.0 MILES
Route 75 Freeway *
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Interstate Route 78
Newark
West of Runyon Street to 13th Avenue
13th Avenue to Orange Street
——_
Interstate Route 280
Newark
DESIGN AND RIGHT OF WAY 3.0 MILES
Route 21
Newark
NO PUBLIC HEARING HELD 1.3 MILES
UNION COUNTY
Estimated Total Cost: $115,000,000
ESSEX COUNTY
*
The Department has suspended most activity on this
route because of shortage of adequate relocation facilities.
36
ROUTE 75 FREEWAY — Length: 6.3 Miles
This Freeway is a vital link in a north-south
artery which will ultimately provide a through
route from Route |—80 in Passaic County to the
Goethals Bridge and Staten Island. Completion
of the project will prove costly because of dense
urban development within the area it traverses.
Delair Bridge Approach
Pennsauken Township
Route 9O Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 73 to Main Street
Main Street to Route 38
Route 38 to Route 295
Route 295 to Route 73
Mount Laurel Township
Route 73
DESIGN AND RIGHT OF WAY 6.3 MILES
CAMDEN COUNTY
Estimated Total Cost: $42,000,000
BURLINGTON COUNTY
ROUTE 90 FREEWAY — Length: 6.3 Miles
This freeway, on new alignment, will connect with the proposed
Delair Bridge over the Delaware River in Pennsauken, and Route 73 in
the vicinity of Church Road, Mount Laure! Township, Burlington County.
It will provide a corridor for traffic north and east of the Camden-Phil a—
delphia area destined for New Jersey shore resorts, bypassing built up
areas. This route will also relieve existing Routes 70, 73 and U.S. 130.
37
Route 33
Route 92 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Route 33 to Route 130 Int. Penn Central RR to Carters Brook
Route 130 Int. to Cranbury Neck Road
Cranbury Neck Road to Penn Central RR
——
Vicinity of Rocky Hill
Route U.S. 206
Hightstown
DESIGN AND RIGHT OF WAY 14.2 MILES
MERCER COUNTY MIDDLESEX COUNTY SOMERSET COUNTY
Estimated Total Cost $33,032,000 ROUTE 92 FREEWAY — Length: 14.2 Miles
$33,0
This Poute is on new alignment and connects Route 206 north of
Princeton with Route 33 just east of Hightstown near the New Jersey
Turnpike. It is needed to provide a limited access bypass of Hights—
town, Kingston and Princeton for through traffic. This facility will
provide more efficient distribution of traffic throughout this rapidly
expanding tri-county suburban area.
38
Whitehead Road
Hamilton Township
Estimated Total Cost: $4,800,000
Route 174 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Whitehead Road to Route 1
|
]
Vicinity of Bakers Basin
Lawrence Township
Route U.S.
DESIGN AND RIGHT OF WAY 1.5 MILES
MERCER COUNTY
ROUTE 174 FREEWAY -— Length: 1.5 Miles
This project is an extension of the Trenton Freeway, and will
connect its present terminus at Whitehead Road with Route U.S. 1]
in the vicinity of Bakers Basin. It will do much to alleviate
congestion at the Brunswick Avenue Circle.
339
Route 24 Freeway
“HGnover towh
ICHUIBA
hip
fe
{
Of OKeLe
6 f)
ons
A ESA SA P ao me AN AC
Oi JUST 2KOO HOA S 230 WIS ¢ LOF
a. |
ot bo
!
|
'
|
|
| 2.0
a! ake
set = oF
a |} O2
SS xt
3] 0
° n
2 a 5
o u
Olena o
_ | _
> we] 2
Seon O=
(ose) ow 4
|
PRELIMINARY STUDY 2.5 MILES = ti2 ITHOIS GUA nolesac NO PUBLIC HEARING HELD 2.5 MILES
_ snes
MORRIS, COUNTY; 5)
ROUTE 178 FREEWAY — Lengths) 5.0;Miles: 59 |:
= Existing Route 53 is a two-lane highway with very poor
horizontal and vertical alignments. It is both hazardous
and congested. This proposed freeway will connect Route 24
Freeway in Hanover Township with Routes U.S. 46 and Interstate
Route 80 in Denville Township.
Route 202, Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Delaware River Bridge to Route 29
Route 29 to Mount Airy
=
=
v”
Cc
& >
ry 5) nN °
0 6 =
> S
= 2 © i) =
[ese (oy = * ©
0 205 7) >
wl = 5S 4 Ee
5 res ©
© oO <
2 oo = oe
; —UsE Jeu
| 0) £0 Oo &
Ores) rerw
DESIGN AND RIGHT OF WAY 5.0 MILES
| HUNTERDON COUNTY
Estimated Total Cost: $7,800,000 i ROUTE 202 FREEWAY — Length: 5.0 Miles
i = : The Delaware River Joint Toll Bridge Commission is presently
lt ni 1
} designing a new bridge across the Delaware River north of Lambert—
(od 5 : : ville. This freeway will serve the new bridge and carry thru traffic
: pu 26007 It < Ip ’ away from the existing overcrowded Route U.S. 202 which goes through
the main streets of Lambertville and New Hope, Pa.
Route 440 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
27th Street to Bayonne Bridge
51st Street to 27th Street, Bayonne
27th Street to 8th Street, Bayonne
51st Street to 27th Street, Bayonne
Bayonne Bridge
Jersey City
54th Street
Jersey City
63rd Street
UNDER CONSTRUCTION .5 MILE
DESIGN AND RIGHT OF WAY 3.2 MILES
HUDSON COUNTY
Estimated Total Cost: $42,000,000 ROUTE 440 FREEWAY ~— Length: 3.7 Miles
This Route will be a four-lane divided highway over new alignment
mo st of which will be built on fill in Newark Bay. It will complete
an artery connecting the tunnel approach roads with the Bayonne
Bridge to Staten Island and will provide relief for local roads through
a densely developed urban area.
42
Interstate Route 95
Route 440 Freeway
PROJECTS BEING DESIGNED FOR CONSTRUCTION
Crows Mill Road to Outerbridge
State Street Viaduct
a 2 2
= Pes =
a 23 0
” ~ 2
¢ 5 °
= a6 Oo
° ie )
re 2c °
ke) wo
& Awo 2
3 ai ts a
* w.)
= 5 5 :
= izeco =
° ey fe fo)
< oz
>
DESIGN AND RIGHT OF WAY 2.0 MILES
UNDER CONSTRUCTION 1.8 MILES
MIDDLESEX COUNTY
ROUTE 440 FREEWAY — Length: 3.8 Miles
Estimated Total Cost: $32,000,000
This link, an extension of Route 1-95, will complete a
circumferential route around the New York metropolitan
area via Staten Island and the Verrazano-Narrows Bridge.
Current industrial development between Route U.S. 1 and
Perth Amboy including the former Raritan Arsenal property
adds to the need for this facility.
43
INTRA-STATE FREEWAYS UNDER
ROUTE 1&9
Hudson and Bergen Counties
Tonnelle Avenue is one of the most congested and
hazardous highways on the state highway system. This
freeway is proposed between the Pulaski Skyway and
Route U.S. 46, a distance of 8 miles, to relieve Tonnelle
Avenue of its thru traffic. The freeway has not been legis-
lated. It would cost an estimated $80,000,000 to build.
ROUTE 40
Salem County
ROUTE 23
Sussex County
The existing land service road between Stockholm and the
New York state line at Port Jervis has substandard horizon-
tal curvature and very poor grades. These engineering features
coupled with residential and commercial development adj acent
to the right-of-way make it impractical to improve the exi sting
roadway. Therefore it is proposed to build a freeway parallel
to Route 23 a distance of 22 miles at a cost of $55,000,000.
Freeway has not been legislated.
ROUTE 72
STUDY
ROUTE 31
Warren County
The most direct route linking Trenton with the Delaware Water
Gap recreational area is Route 31. This land service route is
scheduled for dualization from Pennington to Buttzville. The
Proposed new freeway would link the existing terminus with
the ‘‘Foothills Freeway’’, a proposed scenic highway parallel
to the recreational area. This project is 7 miles long and will
cost $14,000,000. Freeway has not been legislated.
Burlington County
This freeway will run between 1-295 and
The basic purpose of this freeway is to bypass Woodstown. At
present, all Route U.S. 40 traffic must pass through the business
district of Woodstown, causing a restriction to the free flow of traf-
fic both on Route 40 and the local streets. This bypass is 4 miles
long and would cost an estimated $4,000,000. No public hearing has
been held.
Four Mile Circle, a distance of 19.5 miles.
This freeway, coupled with |—895 will provide
a direct access between the rapidly expanding
residential and industrial complex in Bucks
County, Pa., with the Jersey shore. In addition
this route will service the expanding population
ROUTE 74-9
Middlesex County
Due to the rapid industrial development in the north-
eastern portion of Middlesex County, coupled with the
lack of an adequate east-west highway, it is proposed
to construct a freeway between Route 18 in East Bruns-
wick Township and Route 35 in the vicinity of Cheese-
quake Creek, a distance of 9.5 miles. This facility will
provide for the necessary flow of raw materials and manu-
factured products, as well as servicing the needs of the
employees in this highly industrialized section of the county.
The estimated cost of this freeway is $32,000,000. No
public hearing has been held.
in the vicinity of Willingboro.
It will cost an
estimated $38,000,000. No public hearing has
been held.
ROUTE 81
Union County
This project is part of the proposed Elizabeth bypass, and has
a high priority due to the scheduled expansion of Port Elizabeth
as a sealand shipping facility. The estimated cost of this 3.0
miles long route is $35,000,000. No public hearing has been held.
AQ
ROUTE 85
Hudson County
There is a demonstrated need for a direct connection between the
westerly portals of the Lincoln and Holland Tunnels which, in
addition, would service the waterfront through the City of Hoboken.
Initial studies indicate the advisability of constructing a freeway.
However, it would cost $140,000,000 for alengthof3 miles. Additional
studies are contemplated to determine if a facility of a lesser level
of service would suffice. Freeway partially legislated.
INTRA-STATE FREEWAYS UNDER STUDY
FOOTHILLS FREEWAY
Warren and Sussex Counties
This proposed freeway will be constructed at the base of
the easterly slope of the Kittatinny Mountains between the
northern terminus of Route 31 Freeway at Buttzville and the
Route 23 freeway near the New York state line. By locating
the highway parallel to the longitudinal axis of the Delaware
Water Gap recreational area, easy access can be made to the
various recreation sites in New Jersey. The facility is 34
miles long and would cost an estimated $68,000,000. Freeway
has not been legislated.
ROUTE 208
Bergen, Passaic Counties
At present there are no state highways serving upper Pas-
saic County. The towns of Wanaque and Ringwood as well as
the recreational area of Greenwood Lake are most anxious
for improved access. Route location studies are now in progress.
This proposed freeway would extend from Oakland to the New
York state line for a distance of 10.5 miles. The cost would be
$26,000,000. No public hearing has been held.
ROUTE 206
Atlantic County
The Town of Hammonton is experiencing much difficulty with
Present traffic congestion because Route 54 (Bellevue Avenue)
is the town's main business street. This project would provide
a bypass of the business district and thereby eliminate delays
being encountered by through traffic, a high percentage of which
is trucks. This 4 mile project would cost $8,000,000. Freeway
has not been legislated.
ROUTE 322
Gloucester County
The construction of a new bridge across the Delaware
River between Bridgeport and Chester, Pa., will require
a freeway connecting the bridge with the major regional
highways such as Route U.S. 130, Interstate Route 295,
the N.J. Turnpike, and Routes 45 and 47. This freeway
will provide the necessary traffic collection and distribu-
tion, as well as improving service to the Atlantic City
urban area. The 23.3 mile route will cost an estimated
$35,000,000. Freewoy has not been legislated.
45
ROUTE 206
Sussex County
In conjunction with the dualization of the existing
Route 206 north and south, it is proposed to bypass
the Town of Newton. Without this project a capacity
restraint of such serious proportions will exist that
the value of dualizing Route 206 will be negated, and
traffic flow to the recreation areas will be drastically
hindered. In addition, the bypass is necessary for the
orderly expansion of Newton. This 6.9 miles project will
cost an estimated $10,500,000. Freeway has not been
legislated.
ROUTE 807
Essex, Middlesex, Morris, Passaic,
Somerset, Union Counties
This north-south artery is substantially a northern exten-
sion of Interstate Route 95 from its intercept with |-287
in South Plainfield. The highway will lie between |-287
and the Garden State Parkway, and will generally parallel
these facilities. The Parkway through Essex and Union
Counties has reached capacity and the need for an addi-
tional north-south freeway is becoming increasingly more
apparent. The 35.0 mile long route will cost an estimated
$150,000,000 and a corridor study is being made.
1969 CONSTRUCTION PROGRAM PROJECTS—NON-FREEWAY
PROJECTS TRANSFERRED
FROM PRIOR PROGRAMS CONSTRUCTION
Milltown Rd. to Rt. 18 $86,600
RIGHT OF WAY
Rt. 130 Circle $1,000,000
Pierson Ave. to Garden St. Pky.
$100,000
GSP to Green St. $100,000
Green St. to Rt. 9 $100,000
DESIGN
College Bridge $330,000
PLANNING
Communipaw Ave.
$152,000
Rt. 35 to Union County Line
$100,000
Middlesex County Line to |-278
$440,000
Orient Way to Rt. 20 $4,977,000
Orient Way to Berry’s Creek
$9,404,000
Rt. 46 to Orient Way $495,000
Erie-Lackawanna RR to Rt. 208
$1,036,000
Rt. 208 Intersection $110,000
Rt. 17 to Rt. 1-95
$200,000
Rt. 18 to Rt. 34 $1,500,000
Adelphia to Lakewood $330,000
Rt. 9 and Rt. 35 $193,000
Clinton Ave. to G. Washington
Bridge $325,000
Cooper-Miller Rd. $200,000
Ledgewood Circle to Livingston
$440,000
Lovelandtown Bridge (Ocean Co.)
$3,004,000
Bay Ave. to Bridge St.
$1,000,000
Main St., Sparta $162,000
46
a
PROJECTS TRANSFERRED
ROUTE FROM PRIOR PROGRAMS
1969 CONSTRUCTION PROGRAM PROJECTS—NON-FREEWAY
CONSTRUCTION
Interchange — Prospect and
Sheridan Avenues $3,282,000
Rt. 3 to Ann St. $2,622,000
Allendale Ave. Interchange
$2,732,000
RIGHT OF WAY DESIGN PLANNING
Rt. 46 to Rt. 4 $440,000
Linwood Ave. to N.Y. State Line
$1,100,000
Rt. 3 to Paterson Plank Road Rt. 3 to Paterson Plank Road
$500,000 $220,000
Rt. 3 to Monroe St. $350,500
Viaducts over Waverly Yards
$240,000 _
N.Y. Avenue $500,000 N.Y. Ave. to Kiel Ave. $193,000
Cedar Grove $125,000
Five utility relocation balances
$1,497,040
Millstone River Bridge $928,000
Willow-Wood Ave. Edison-
Woodbridge $83,000
Metuchen $231,000
Terrill Avenue to Spring Street
Fanwood-Westfield $543,000
Stratford Intersection $123,000
47
1969 CONSTRUCTION PROGRAM PROJECTS—NON-FREEWAY
PROJECTS TRANSFERRED
ROUTE FROM PRIOR PROGRAMS CONSTRUCTION RIGHT OF WAY DESIGN PLANNING
30/130 Airport Circle to Collingswood
Circle $275,000.
33 N.J. Turnpike to Iron Ore Rd Manalapan Br. to Fairfield Ave
$4,003,000 $3,900,000
Rt. 35 to Rt. 71 $1,000,000
35 Brielle Circle to Monmouth Fwy. Shark River to Sylvania Ave. Eatontown to Asbury Ave.
$70,000 $1,703,000 $3,000,000
Rt. 1 to Rt. 27 $192,178 Shark River to Sylvania Ave.
$500,000
37 Barnegat Bridge $4,404,000 Rt. 70 to GSP $165,000
Lillie Ave. to GSP $3,204,000
38 Rt. 34 to Rt. 35 $500,000
40 Rt. 40 to Rt. 322 $3,004,000 Buena Vista $100,000
42 Intersection revision at Rt.
U.S. 322 $234,000
44 Clonmell Creek Culvert
$109,000
45 Rt. 8 to Redwood Ave.
$2,244,000
46 Baldwin Rd. $80,000 Rt. 3 to Rt. 21 $220,000
48
1969 CONSTRUCTION PROGRAM PROJECTS—NON—-FREEWAY
PROJECTS TRANSFERRED
FROM PRIOR PROGRAMS CONSTRUCTION RIGHT OF WAY DESIGN PLANNING
Interchanges:
Midland Ave. and River Rd.
$250,000 $165,000
Rt. 53 to Passaic River
Oak Rd. to Chestnut Ave.
$504,000
Heston Rd. and Main St.
$94,000
Laurel St. to Pearl St. $240,000
Rt. 33 to Asbury Ave. $125,000
GSP to Herbertsville Rd.
$1,000,000
Stockton Blvd. to Blakley Ave.
$153,000
Rt. 30 to Atl. City Expy.
$4,404,000
Brigantine Bridge $4,704,000 Brigantine Bridge $300,000
Erie-Lackawanna Bridge (Sussex)
$111,000
Rancocas Creek Bridge
$165,000
Cape May Canal Bridge
$1,504,000
49
1969 CONSTRUCTION PROGRAM PROJECTS—NON—FREEWAY
PROJECTS FROM
PRIOR PROGRAMS CONSTRUCTION RIGHT OF WAY DESIGN PLANNING
Bayonne Connector $1,268,903
Somerville Circle $275,000
Rt. 80 to Rt. 206 $2,181,800 Rt. 130—206 to White Horse Belle Mead $250,000 Mt. Holly to Hammonton
$2,093,000 $550,000
Goffle Rd. to Oakland Ave.
$2,752,000
Scotland Run $134,000
Dorset Ave. Connector
$193,000
Longport Bridge $336,000
50
NDOT RESEARCH LIBRARY
APRIL, 1969
BUREAU OF PUBLIC INFORMATION
DIVISION OF CENTRAL SERVICES
DEPARTMENT OF TRANSPORTATION
1035 PARKWAY AVENUE
TRENTON, NEW J ERSEY